Coal Terminal

20,00

million tons per year

Basic turnover of the coal terminal of Primorsky UTC

up to

25,00

million tons per year

Prospective turnover

Coal is delivered to the terminal by rail via the existing Vyborg–Primorsk railway line

The coal terminal provides for the construction of closed truss warehouses, which exclude dusting. Warehouses, transshipment units and conveyor galleries are equipped with the most modern equipment.

Pier length 700 m
2 berths
Deadweight up to 200 thousand tons
d draft up to 16.0 m
Water area depth 18.0 m

Main services at the coal terminal

  • unloading of railway wagons
  • temporary storage and accumulation of a shipload
  • loading into vessels

Functional zoning of the coal terminal:

  • railway cargo area
  • temporary storage warehouse (closed truss warehouses)
  • conveyor transportation systems
  • sea cargo area with two cargo berths
  • administrative and communal area
  • railway yard

Main technical characteristics of the temporary coal storage warehouse:

  • total storage capacity – up to 1.2 million tons of coal
  • number of closed truss warehouses – 2 pcs
  • estimated number of coal grades – up to 10
  • operating mode – 24 hours a day, 7 days a week

Mineral Fertilizer Terminal

Container Terminal

Warehouse Logistics Center

General Cargo Terminal

Cereal Terminal