General Cargo Terminal
Basic turnover of general cargo terminal of Primorsky UTC
up to
2,00
million tons per year
Prospective turnover
General cargoes are delivered to the terminal by rail and road
Pier length 350 m
1 berth
Deadweight up to 45 thousand tons
and draft up to 10.0 m
Water area depth 18.0 m
Main services at the general cargo terminal:
- unloading/loading of railway wagons
- unloading/loading of road transport
- temporary storage and accumulation of a shipload
- loading/unloading of vessels
Functional zoning of the terminal:
- railway cargo area
- vehicle cargo area
- temporary storage warehouse
- container freight stations
- sea cargo area — one berth with a ramp for transshipment of general cargo, containers, rolled and oversized cargo